ProjectArchiveNews / secondary source
Hassyan SWRO Phase 2 GRE pipelines, Project 2: three bids, Tristar lowest at AED 792.6m
DEWA received three offers for the second GRE water transmission pipeline package serving Hassyan SWRO phase two. Tristar Engineering & Construction bid lowest; Green Oasis and Wade Adams followed. No award reported.
FRP relevance: high
Confirmed by sourceGRE water transmission pipelines
Potential productsGRE fittings
- Owner
- Dubai Electricity and Water Authority (DEWA)
- Consultant
- Not publicly confirmed
- EPC / contractor
- Tristar Engineering & Construction (lowest bidder, award pending)
- Location
- Hassyan, Dubai
- Project value
- AED 792.59m (lowest bid); AED 800.02m; AED 989.65m
- Currency
- AED
- Status
- Tender
- Announced
- 22 Jul 2026
- Expected completion
- Not publicly confirmed
- Source type
- News / secondary source
Published 22 Jul 2026 · Collected 26 Oct 2026 · Last verified 26 Oct 2026
Original source
MEED · News / secondary source
Read the original at MEED →Also reported by: Smart Water Magazine
This page is an original short summary. The full content belongs to its publisher.