What we can analyze
Depending on the information available in your project documents.
What you send us
- P&ID
- Isometric drawings
- Layout drawings
- GA drawings
- BOQ
- Material schedules
- Line lists
- Project specifications
- Tender documents
- Other relevant project documents
You do not need every document. The more complete the project information, the more accurate the quantity analysis can be.
What you receive
Depending on the project scope, your final deliverable may include:
- Pipe quantity by diameter
- Pipe length summary
- Fitting quantity
- Flange quantity
- Manhole quantity
- Line / project-area breakdown
- Consolidated material summary
- Excel MTO / BOQ
- PDF summary if requested
How it works
Request → review → quotation → payment arrangement → work → delivery. There is no online payment.
- Step 1Submit projectSend project documents and basic project information.
- Step 2Document reviewWe review the available information and determine the scope of the take-off.
- Step 3QuotationWe provide the service price based on project size and complexity.
- Step 4Quantity analysisAfter confirmation and payment, we prepare the material take-off.
- Step 5DeliveryReceive the completed quantity report.
Who is this for?
Example: FRP cooling-water piping project
Illustrative example only — not an actual project. It shows the format of a quantity summary, not real quantities.
| Item | Description | Size | Quantity | Unit |
|---|---|---|---|---|
| FRP pipe | FRP pipe | DN300 | 850 | m |
| FRP pipe | FRP pipe | DN500 | 420 | m |
| Elbow | 90° elbow | DN300 | 24 | Nos |
| Elbow | 45° elbow | DN300 | 12 | Nos |
| Tee | Reducing tee | DN500 × DN300 | 8 | Nos |
| Reducer | Concentric reducer | DN500 × DN300 | 6 | Nos |
| Flange | FRP flange | DN300 | 48 | Nos |
| Manhole | FRP manhole | To project specification | 6 | Nos |
Engineering note
FRP Global Hub prepares material quantity take-offs based on the project information and documents provided by the client. Final engineering design, specifications, pressure class, structural requirements, codes, standards and project compliance remain subject to the client's approved engineering documents and project requirements.
- The analysis is based on the documents supplied by the client.
- Missing information may affect quantities.
- Any assumptions will be clearly identified.
- Final quantities should be checked against approved project documents before procurement or fabrication.
Have an FRP/GRP project?
Send us the project information and request a quotation for material quantity analysis.
Pricing: Pricing depends on project size, document complexity and required scope. Submit your project for a quotation.
Your email is ready
Your email program should have opened with the request addressed to info@frpglobalhub.com. Please review it and press send. If nothing opened, copy the text below and email it to us.
After submitting your request, we will contact you with instructions for securely sending project documents.