ProjectArchiveNews / secondary source
Shuqaiq–Jizan water transmission system phase 4 — pipe material not stated by source
MEED reported the roughly USD 3bn, 523 km, 600,000 m³/d transmission scheme procured by the Saudi water transmission company as under bid evaluation, with award expected by end-2025; it was first tendered in 2023. Pipe material is not stated.
FRP relevance: medium
Potential productsLarge-diameter GRP/GRE transmission pipe (potential) — potential FRP application, not confirmed by source
- Owner
- Water Transmission & Technologies Company (WTTCO)
- Consultant
- Not publicly confirmed
- EPC / contractor
- Not publicly confirmed
- Location
- Al Shuqaiq to Jizan, Saudi Arabia
- Project value
- 3000000000
- Currency
- USD
- Status
- Tender
- Announced
- 16 Sept 2025
- Expected completion
- Not publicly confirmed
- Source type
- News / secondary source
Published 16 Sept 2025 · Collected 18 Oct 2026 · Last verified 18 Oct 2026
Original source
MEED · News / secondary source
Read the original at MEED →This page is an original short summary. The full content belongs to its publisher.