ProjectArchiveNews / secondary source
Shuaibah SWRO phase 2 (545,000 m³/d): Al-Fatah Water & Power main contractor — pipe material not stated
MEED reported that construction of the USD 521m Shuaibah seawater reverse-osmosis phase 2 plant south of Jeddah began in June 2025 after Al-Fatah Water & Power was appointed main contractor. No pipe or tank materials are named.
FRP relevance: medium
Potential productsGRP intake/outfall and process piping (potential) · FRP tanks (potential) — potential FRP application, not confirmed by source
- Owner
- Not publicly confirmed
- Consultant
- Not publicly confirmed
- EPC / contractor
- Al-Fatah Water & Power
- Location
- Shuaibah, Red Sea coast south of Jeddah, Saudi Arabia
- Project value
- 521000000
- Currency
- USD
- Status
- Under construction
- Announced
- 16 Sept 2025
- Expected completion
- Not publicly confirmed
- Source type
- News / secondary source
Published 16 Sept 2025 · Collected 18 Oct 2026 · Last verified 18 Oct 2026
Original source
MEED · News / secondary source
Read the original at MEED →This page is an original short summary. The full content belongs to its publisher.