ServicesMaterial take-off
News collected:
ProjectArchiveNews / secondary source

Shuaibah SWRO phase 2 (545,000 m³/d): Al-Fatah Water & Power main contractor — pipe material not stated

Saudi ArabiaWaterGRP pipe, FRP tanks16 Sept 2025

MEED reported that construction of the USD 521m Shuaibah seawater reverse-osmosis phase 2 plant south of Jeddah began in June 2025 after Al-Fatah Water & Power was appointed main contractor. No pipe or tank materials are named.

FRP relevance: medium
Potential productsGRP intake/outfall and process piping (potential) · FRP tanks (potential) — potential FRP application, not confirmed by source
Owner
Not publicly confirmed
Consultant
Not publicly confirmed
EPC / contractor
Al-Fatah Water & Power
Location
Shuaibah, Red Sea coast south of Jeddah, Saudi Arabia
Project value
521000000
Currency
USD
Status
Under construction
Announced
16 Sept 2025
Expected completion
Not publicly confirmed
Source type
News / secondary source
Published 16 Sept 2025 · Collected 18 Oct 2026 · Last verified 18 Oct 2026

Original source

MEED · News / secondary source

Read the original at MEED →

This page is an original short summary. The full content belongs to its publisher.