ServicesMaterial take-off
News collected:
TenderArchiveClosedNews / secondary source

NEOM/Enowa: modular temporary wastewater plant for Oxagon — bid deadline extended

Saudi ArabiaWaterFRP tanks, GRP pipe8 Oct 2026

Enowa extended to 25 October the bid deadline for a design-build-operate modular plant (35,000–45,000 m³/d industrial plus 1,000 m³/d sanitary) at Oxagon. Pipe and tank materials not stated by source.

FRP relevance: medium
Potential productsPotential FRP tanks / GRP process piping in modular WWTP — potential FRP application, not confirmed by source
Issuing authority
Enowa (NEOM)
Location
Oxagon, NEOM, Saudi Arabia
Tender / ref. no.
Not publicly confirmed
Issue date
Not publicly confirmed
Closing date
25 Oct 2026
Estimated value / bond
Up to USD 165m (MEED estimate)
Stage
Bids submitted 9 Nov 2026 by at least five teams (Alfanar/Lanke, Alkhorayef, Orascom/Wabag, Safari/Veolia, Wetico/Satco); estimated cost up to USD 165m per MEED
Source type
News / secondary source
Published 8 Oct 2026 · Collected 13 Oct 2026 · Last verified 24 Nov 2026
Public listing information. FRP Global Hub is not a tender-issuing authority. Tender details are summarised from official portals, tender listing sites or news reports, each labelled with its source type. Confirm every detail in the issuing authority's official notice before bidding.

Original source

Smart Water Magazine · News / secondary source

Read the original at Smart Water Magazine →

Also reported by: MEED

This page is an original short summary. The full content belongs to its publisher.