SustainabilityDate unverifiedPrototypeNews / secondary source
REFRESH project builds wind blade section using pyrolysed recycled glass fibre
In the EU REFRESH project, CETMA and Gjenkraft produced a blade section partly from recycled material, including a nonwoven mat of glass fibre recovered by Gjenkraft's pyrolysis process; ÉireComposites built the blade.
FRP relevance: low
Confirmed by sourceRecycled glass fibre nonwoven mat
- Stage
- Prototype
Published: Source says 'Nov. 11' without a year · Collected 25 Nov 2026 · Last verified 25 Nov 2026
Original source
CompositesWorld · News / secondary source
Read the original at CompositesWorld →This page is an original short summary. The full content belongs to its publisher.