North Kabd wastewater treatment plant (up to 1m m³/d), Kuwait: CSCEC breaks ground on KWD 998m DBO project — pipe material not stated by source

KuwaitWaterWastewater treatment4 Nov 2026

CSCEC held the groundbreaking for Kuwait's North Kabd wastewater treatment plant and related works for the Ministry of Public Works, a design-build-operate-maintain contract of about KWD 998m signed in July 2026. Capacity is stated at up to 1 million m³/day.

FRP relevance: medium
Potential productsGRP sewer/effluent pipes, FRP tanks, covers and odour-control ducting (potential) — potential FRP application, not confirmed by source
Owner
Ministry of Public Works, Kuwait
Consultant
Not publicly confirmed
EPC / contractor
China State Construction Engineering Corporation (CSCEC)
Location
North Kabd, Kuwait
Project value
About KWD 998m (about USD 3.3bn)
Currency
KWD
Status
Under construction
Announced
4 Nov 2026
Expected completion
Not publicly confirmed
Source type
News / secondary source
Published 4 Nov 2026 · Collected 9 Nov 2026 · Last verified 9 Nov 2026