ServicesMaterial take-off
News collected:
ProjectRecentNews / secondary source

Montoir-de-Bretagne LNG terminal renewal (Ulysse): Amiblu to supply and install DN1200 GRP overhead pipes

FranceOil & GasGRP pipe10 Nov 2026

Amiblu Pipes Spain won a turnkey scope to engineer, make and install two DN1200 GRP overhead lines (about 1.2 km in total) on a 6 m rack feeding two new open-rack vaporizers at Elengy's LNG terminal in France. Works are scheduled from March 2027 to January 2028 within a project budget reported at €220 million.

FRP relevance: high
Confirmed by sourceGRP pipe DN1200 (overhead seawater lines to ORV units)
Owner
Elengy
Consultant
Sacyr Proyecta (developer of overall renovation project, per source)
EPC / contractor
Amiblu Pipes Spain (GRP pipe turnkey scope)
Location
Montoir-de-Bretagne, France
Project value
220 million (overall project budget)
Currency
EUR
Status
Awarded
Announced
10 Nov 2026
Expected completion
2028-01
Source type
News / secondary source
Published 10 Nov 2026 · Collected 26 Nov 2026 · Last verified 26 Nov 2026

Original source

iAgua · News / secondary source

Read the original at iAgua →

This page is an original short summary. The full content belongs to its publisher.