ServicesMaterial take-off
News collected:
ProjectRecentNews / secondary source

Haliba field produced-water treatment facilities, Abu Dhabi: Al Dhafra Petroleum awards USD 272m DBO deal to Excel ASTRA — pipe material not stated by source

UAEOil & GasProduced water treatment6 Nov 2026

Al Dhafra Petroleum signed a design-build-operate agreement worth about AED 1bn with Excel ASTRA Engineering & Construction for produced-water treatment facilities at its Haliba field. The deal was signed at ADIPEC 2026; capacity and duration were not disclosed.

FRP relevance: medium
Potential productsGRE/GRP produced-water piping and FRP tanks (potential) — potential FRP application, not confirmed by source
Owner
Al Dhafra Petroleum
Consultant
Not publicly confirmed
EPC / contractor
Excel ASTRA Engineering & Construction LLC
Location
Haliba field, Abu Dhabi, UAE
Project value
AED 1 billion (about USD 272m)
Currency
AED
Status
Awarded
Announced
6 Nov 2026
Expected completion
Not publicly confirmed
Source type
News / secondary source
Published 6 Nov 2026 · Collected 9 Nov 2026 · Last verified 9 Nov 2026

Original source

SaudiGulf Projects · News / secondary source

Read the original at SaudiGulf Projects →

This page is an original short summary. The full content belongs to its publisher.